3 bedrooms
1 living room
2 bathrooms
Brand new | Quality build by the Dargaville High School Building Academy |
Low maintenance | Built with current superior building materials |
Full insulation | Wrapped up like a warm blanket, there is also insulation on many of the interior walls for sound proofing |
After successful sales to date of the relocatable houses built by Dargaville High School Building Academy, the next project is now underway, refer to plans in the photo gallery, all photos are of the second show home which is now sold. The new build is for the floor plan "Miro" with mono-pitch roof, which has three bedrooms, two bathrooms, master bedroom with ensuite and walk-in robe, with central open plan living areas and stacker doors on two sides. Time frame for completion is April 2021.
If you are thinking of moving a house onto land or a section, we welcome enquiry for the new build, which can be potentially in your own colour/finishing schemes. Get in touch with us to talk about details.
Licensed under the REA Act 2008
Mobile: +64 27 459 4528 |
Office: +64 9 470 0960 |
jude.oconnor@bayleys.co.nz |
Licensed under the REA Act 2008
Mobile: +64 27 256 8988 |
Office: +64 9 470 0960 |
leah.odriscoll@bayleys.co.nz |
3 bedrooms
1 living room
2 bathrooms
Brand new | Quality build by the Dargaville High School Building Academy |
Low maintenance | Built with current superior building materials |
Full insulation | Wrapped up like a warm blanket, there is also insulation on many of the interior walls for sound proofing |
Kauri Street, Dargaville High School Building Academy, Dargaville
Open in mapLicensed under the REA Act 2008
Mobile: +64 27 459 4528 |
Office: +64 9 470 0960 |
jude.oconnor@bayleys.co.nz |
Licensed under the REA Act 2008
Mobile: +64 27 256 8988 |
Office: +64 9 470 0960 |
leah.odriscoll@bayleys.co.nz |
Please login or register
Login / Register